On 2n of September, 2020, the inspection team with 5 representatives were lead by Mr Yang Xingshui, the chief of Key Construction Project Section of Shandong Development and Reform Commission, arrived Sino-German Intelligent Manufacturing Integrated Industry and Eduction Demonstration Base (Sino-German Industrial IOT R&D and Manufacturing Base) to inspect the project status.
The inspection team viewed the construction site, and listened to the report about construction status. Lastly, they gave recognition to the construction of the project.